The OPA, in collaboration with the Ministry of Energy, is providing responses to questions related to the designated activities in the domestic grids found in the FIT and microFIT contracts. These responses will be updated periodically as new questions are received.
DOMESTIC CONTENT UPDATE AUGUST 10, 2011
The OPA and the Ministry of Energy will consider the creation of a new Domestic Content Grid for Concentrated Solar Photovoltaic (CPV). This will include consideration of solar concentration levels in order to distinguish CPV from other solar PV technologies.
Meanwhile, until further notice, the OPA will assess Domestic Content compliance of Concentrated Solar Photovoltaic (CPV) technology that uses thin-film cells using the Domestic Content Grids of Table 3 of Exhibit D for FIT Contracts and Table 2 of Appendix C for microFIT contracts.
DOMESTIC CONTENT UPDATE APRIL 26, 2011
We thank all stakeholders who provided comments on the thin film module draft interpretation that was posted from November 29th, 2010 to January 7th, 2011. After a careful review of the submissions, a final interpretation will not be posted.
The OPA and Ministry of Energy have provided final interpretations regarding Exhibit D Domestic Content: Table 2, Activity #6, Table 3, Activity #4 and Table 4, Activity #6. The interpretations are regarding mounting systems.
Domestic Content Update April 26, 2011
DOMESTIC CONTENT UPDATE OCTOBER 4, 2010
The OPA and Ministry of Energy have provided final interpretations regarding Exhibit D Domestic Content Table 2, Activity #5, Table 3, Activity #3 and Table 4, Activity #5. The interpretations relate to inverter assembly, - specifically to what are considered to be components that may be fabricated outside Ontario but must be assembled and integrated into the inverter in Ontario. Click on the link below to view the update.
Domestic Content Update October 4, 2010
DOMESTIC CONTENT UPDATE DECEMBER 14, 2009
Please note: these interpretations are provided as assistance only and are specific to the specially listed table items. These interpretations do not waive any contractual terms regarding Domestic Content and Designated Activities. All capitalized terms have the same meaning as in the FIT contract. This table may be updated from time to time without notice.
General information
The OPA will not review specific project developers' cost breakdowns to determine compliance with domestic content requirements. The OPA will respond to requests for clarification and its responses will be based on a determination of reasonable compliance with the description of the designated activity.
| FIT or microFIT Program | Domestic Content Table no. | Grid Cell Reference no. | Description of Designated Activity | OPA Answers |
| FIT | 1 | 1 | Wind turbine blades cast in a mould in Ontario and instrumentation that is within the blades has been assembled in Ontario. | Instrumentation includes, but is not limited to, any sensors and associated signal processing within the blade. |
| FIT | 1 | 4 | Hub and hub casing, where the hub has been entirely machined in Ontario, i.e., without any pre-machining performed outside Ontario, other than peeling/roughing of the part for quality control purposes when it left the smelter or forge. | Casting of the hub is not included in this designated activity. |
| FIT | 1 | 8 | Drive shaft has been entirely machined in Ontario, i.e., without any other pre-machining performed outside Ontario other than peeling/roughing of the part for quality control purposes when it left the smelter or forge. | Forging of the shaft is not included in this designated activity. |
| FIT | 1 | 9 | Power converter where the assembly, final wiring and testing has been done in Ontario. | Final wiring refers to the wiring internal to the converter. Wiring of the converter to other components is not included in this designated activity. |
| FIT | 1 | 12 | Control panel and electronics, where the assembly, final wiring and testing have been done in Ontario. | Final wiring refers to the wiring internal to the control panel and electronics. Wiring of the control panel and electronics to other components is not included in this designated activity. |
| FIT | 1 | 15 | Pad mount or equivalent transformers that have been wound and tested in Ontario. | For greater certainty, transformers can be located inside the base of turbines or in the nacelle. |
| FIT | 2 | 6 | Mounting systems, where the structural components of the fixed or moving mounting systems have been entirely machined or formed or cast in Ontario. The metal for the structural components may not have been pre-machined outside Ontario, other than peeling/roughing of the part for quality control purposes when it left the smelter or forge. The machining and assembly of the mounting system must have entirely taken place in Ontario (i.e., bending, welding, piercing and bolting). |
Building integrated solar photovoltaic (BIPV): for a solar PV module that replaces a building part but has additional or special structural components that attach the module to the building, those components shall count as the mounting system. |
| FIT | 3 | 4 | Same as above. | |
| FIT | 4 | 6 | Same as above. | |
| microFIT | 6 | Same as above. | ||
| FIT | 3 | 1, 2 |
Thin film photovoltaic cells where the active photovoltaic layer(s) have been fabricated (by methods including but not limited to vapour deposition, evaporation or sputtering) in Ontario. Where the manufacture of the module is inseparable from the manufacture of the cells, there shall be no separate requirement for the module.
Solar photovoltaic module (i.e., panel), where the electrical connections between the solar cells have been made in Ontario and solar photovoltaic module materials have been encapsulated in Ontario. |
Where designated activity 1 and designated activity 2 are inseparable (i.e., where there is no separate step to encapsulate a thin film solar module), the qualifying percentage for each of these activities will be awarded for the completion of the combined activity. |
| FIT | 2 | 5 | Inverter, where the assembly, final wiring and testing have been done in Ontario. |
|
| FIT | 3 | 3 | Same as above. | |
| FIT | 4 | 5 | Same as above. | |
| microFIT | 5 | Same as above. |
Click on the link below to view this table in PDF format: