Comments on July 2009 FiT Rules |
Wednesday, July 29, 2009 |
|
Comment on Draft FIT Rules |
Wednesday, July 29, 2009 |
|
FIT rules submission |
Tuesday, July 28, 2009 |
|
ATS Automation Submisson on Provincial Content for Solar |
Tuesday, July 28, 2009 |
|
FIT Program Rules July 10, 2009 Submission |
Tuesday, July 28, 2009 |
|
Comments: Draft Feed-In Tariff Program Rules July 10 2009 |
Tuesday, July 28, 2009 |
|
Comments of Draft Feed in Tariff Rules |
Tuesday, July 28, 2009 |
|
Renewable Energy and CO2e Emissions |
Tuesday, July 28, 2009 |
|
Comments on draft FIT Rules, July 10th Revisions |
Tuesday, July 28, 2009 |
|
ORTECH comments on draft FIT Rules |
Tuesday, July 28, 2009 |
|
Proposed FIT Rule Response |
Tuesday, July 28, 2009 |
|
CH Four Biogas: Comments on Draft FIT Rules |
Tuesday, July 28, 2009 |
|
Feed-in Tariff Submission on Landfill Gas |
Tuesday, July 28, 2009 |
|
Power Workers' Union submission on July 10, 2009 FIT Draft Contract |
Tuesday, July 28, 2009 |
|
Draft Program Rules - OWA Submission |
Tuesday, July 28, 2009 |
|
Draft Fit Program Rules |
Tuesday, July 28, 2009 |
|
Axio Power Canada Inc., Comments RE FiT Program |
Tuesday, July 28, 2009 |
|
Green Energy Act Alliance FIT submission July 28, 2009 |
Tuesday, July 28, 2009 |
|
FEED-IN TARIFF PROGRAM RULES JULY 10 2009 - CANSIA SUBMISSION |
Tuesday, July 28, 2009 |
|
Executive Coordinator |
Tuesday, July 28, 2009 |
|
General Comments on FIT Program Rules |
Tuesday, July 28, 2009 |
|
GDF SUEZ Energy NA - Comments on July 10 FIT Rules |
Tuesday, July 28, 2009 |
|
Feed-In Tariff Program - draft of July 10, 2009 |
Tuesday, July 28, 2009 |
|
Comments on Proposed FIT Program |
Tuesday, July 28, 2009 |
|
Dr. Ingo Stuckmann |
Tuesday, July 28, 2009 |
|
Legacy CIAs. |
Tuesday, July 28, 2009 |
|
Could be Un-FIT ? |
Tuesday, July 28, 2009 |
|
Ledgecroft Farms Comments on OPA FIT Program |
Tuesday, July 28, 2009 |
|
Dissappointed Legacy Project Holders |
Monday, July 27, 2009 |
|
Ledgecroft Farms Comments to OPA FIT Program |
Monday, July 27, 2009 |
|
Contract Reserves for Ordinary Ratepayers |
Monday, July 27, 2009 |
|
Manager of Operations |
Monday, July 27, 2009 |
|
Gaming with Acceleration Days |
Monday, July 27, 2009 |
|
Interplay of NTP and Acceleration Days |
Monday, July 27, 2009 |
|
Provincial Content for MicroFIT Solar PV Projects |
Monday, July 27, 2009 |
|
Proposal regarding new FIT rule draft and stakeholder consultation held on 21st of July 2009 |
Monday, July 27, 2009 |
|
Comments on proposed FIT Rules re Biogas |
Monday, July 27, 2009 |
|
Provincial Content Requirements |
Sunday, July 26, 2009 |
|
SCHNEIDER POWER COMMENTS ON OPA DRAFT RULES |
Sunday, July 26, 2009 |
|
Comments re: June 10 Draft FIT Rules |
Friday, July 24, 2009 |
|
ALL Existing RESOPS not eligable for FIT |
Thursday, July 23, 2009 |
|
Ms |
Wednesday, July 22, 2009 |
|
Applicant Control Group - Similar Facility |
Tuesday, July 21, 2009 |
|
Three Rules for Three Components |
Tuesday, July 21, 2009 |
|
Map of Ontario Rural Areas Inelligible to Tie Into Grid |
Monday, July 20, 2009 |
|
FIT Contract Pricing for Brownfields |
Sunday, July 19, 2009 |
|
Wind Energy (not fair) |
Sunday, July 19, 2009 |
|
RESOP Contract Holders Being Left Behind |
Friday, July 17, 2009 |
|
Application Requirement |
Thursday, July 16, 2009 |
|
VP Engineering |
Thursday, July 16, 2009 |
|
Manager of Operations |
Wednesday, July 15, 2009 |
|
Permanent Brownfield Sites |
Tuesday, July 14, 2009 |
|
Fair treatment of RESOP pioneers? |
Saturday, July 11, 2009 |
|
No Small Wind Incentives? |
Saturday, July 11, 2009 |
|
Existing RESOPS not eligable for FIT |
Saturday, July 11, 2009 |
|
Comments on Draft FIT Contract |
Monday, July 06, 2009 |
|
Need for hydrokinetic FIT within waterpower |
Tuesday, June 30, 2009 |
|
Draft FIT contract |
Monday, June 29, 2009 |
|
FIT Contract - Term |
Friday, June 26, 2009 |
|
Comments re DRAFT contract |
Friday, June 26, 2009 |
|
Renewable Biomass to include Municipal Organic Waste |
Friday, June 26, 2009 |
|
Comments on Draft FIT Contract |
Friday, June 26, 2009 |
|
GEAA FIT analysis Part III |
Friday, June 26, 2009 |
|
Comments on FIT Contract |
Friday, June 26, 2009 |
|
FIT Contract - Section 15.7 No Assignment or Change of Control for Specified Period |
Friday, June 26, 2009 |
|
Section 13.3 OPA Indemnification |
Friday, June 26, 2009 |
|
FIT Contract - Section 9.2 Remedies of the OPA |
Friday, June 26, 2009 |
|
FIT Contract Questions and Comments to OPA |
Friday, June 26, 2009 |
|
2.4 Notice to Proceed (Exhibit A: Technology Specific Provisions) - Liability Limit |
Friday, June 26, 2009 |
|
FIT Contract - Section 1.5 |
Friday, June 26, 2009 |
|
PWU's Comments on Draft FIT Contract - June 8, 2009 |
Friday, June 26, 2009 |
|
Feed-in Tariff Rates |
Friday, June 26, 2009 |
|
OWA Input to Draft FIT Contract |
Friday, June 26, 2009 |
|
Micro Generation PV Solar < 250 kw injurious to Canadian Small Business |
Friday, June 26, 2009 |
|
Energy-from-waste is clean and renewable |
Friday, June 26, 2009 |
|
Feed-In Tariff Contract |
Thursday, June 25, 2009 |
|
Comments to draft FIT contract |
Thursday, June 25, 2009 |
|
Recommended Changes to Draft FIT Rules and Contract |
Thursday, June 25, 2009 |
|
Ground Solar PV on Brownfields, including municipal and industrial landfills |
Wednesday, June 24, 2009 |
|
Associate, Corporate Finance |
Thursday, June 18, 2009 |
|
Draft Contract - June 08 |
Tuesday, June 16, 2009 |
|
Rooftop Definition, Parking Canopies |
Wednesday, June 10, 2009 |
|
Use of Wind Resource Data |
Tuesday, June 09, 2009 |
|
Legacy status and CIA's |
Monday, June 01, 2009 |
|
Small Wind - Don't leave us out! |
Thursday, May 28, 2009 |
|
Erratum - taxes regarding Solar PV. |
Thursday, May 28, 2009 |
|
Property taxes - Solar PV |
Thursday, May 28, 2009 |
|
Queue Retention |
Monday, May 25, 2009 |
|
Lottery |
Sunday, May 24, 2009 |
|
Solar Ponds with Natural Gas Expanders |
Friday, May 22, 2009 |
|
Home REFIT general |
Thursday, May 21, 2009 |
|
Small wind treatment in USA |
Thursday, May 21, 2009 |
|
Comments on TAT & ECT |
Wednesday, May 20, 2009 |
|
Suggestions for FIT Initialization |
Wednesday, May 20, 2009 |
|
Lottery |
Tuesday, May 19, 2009 |
|
Decommissioning of solar panels |
Tuesday, May 19, 2009 |
|
Contract length for offshore wind |
Tuesday, May 19, 2009 |
|
Lottery |
Tuesday, May 19, 2009 |
|
Shovel Ready |
Monday, May 18, 2009 |
|
Legacy status treatment |
Saturday, May 16, 2009 |
|
Small wind pricing rationale |
Friday, May 15, 2009 |
|
Alternative cost sharing mechanism to build distribution and transmission lines for FIT Projects |
Thursday, May 14, 2009 |
|
Queue Exempt Facilities |
Wednesday, May 13, 2009 |
|
Setting the right FIT price for biomass |
Wednesday, May 13, 2009 |
|
President |
Wednesday, May 13, 2009 |
|
Energy Storage At Wind Generators |
Wednesday, May 13, 2009 |
|
Revise May 12 Approach to Legacy Projects |
Tuesday, May 12, 2009 |
|
Micro generators (RESOP) and certain larger scale RESOP applicants should be able to apply for FIT |
Tuesday, May 12, 2009 |
|
FIT Lottery |
Tuesday, May 12, 2009 |
|
Director- Winstar solar Solutions Inc. |
Tuesday, May 12, 2009 |
|
Biogas RESOP v FIT |
Tuesday, May 12, 2009 |
|
Create 2nd Tier < 500 kW GROUND MOUNTED SOLAR |
Saturday, May 09, 2009 |
|
All solar technologies should get the PV rate... |
Thursday, May 07, 2009 |
|
Comments on Ground-Mounted Solar PV |
Tuesday, May 05, 2009 |
|
ian |
Monday, May 04, 2009 |
|
60% Rule |
Monday, May 04, 2009 |
|
FIT legacy queue position and the CIA red line. |
Friday, May 01, 2009 |
|
Small Wind Category |
Thursday, April 30, 2009 |
|
Graduated Rates |
Thursday, April 30, 2009 |
|
Exclusion of Geothermal |
Wednesday, April 29, 2009 |
|
Comments on draft FIT Rules |
Tuesday, April 28, 2009 |
|
Legacy Queue Position |
Monday, April 27, 2009 |
|
Scotial Capital FIT Report: Alternative & Renewable Energy |
Saturday, April 25, 2009 |
|
Legacy projects and the red line |
Friday, April 24, 2009 |
|
Feed-in Tariff (FIT) Submission |
Wednesday, April 22, 2009 |
|
OWA Additional Comment - Legacy Projects |
Monday, April 20, 2009 |
|
CanSIA Submission 2 - Legacy Projects |
Friday, April 17, 2009 |
|
SIA List & Transmission Project Legacy Treatment |
Friday, April 17, 2009 |
|
LDC & MicroFit (Question 10413) |
Friday, April 17, 2009 |
|
SIA Application List - Legacy Projects |
Friday, April 17, 2009 |
|
Further considerations for transmission connected projects |
Thursday, April 16, 2009 |
|
Interested Party |
Thursday, April 16, 2009 |
|
CanSIA Submission 2 - Regarding Legacy Projects |
Wednesday, April 15, 2009 |
|
Legacy Connection Queue Position under the FIT Program |
Tuesday, April 14, 2009 |
|
Definition of Community Group |
Tuesday, April 14, 2009 |
|
Submission 1 - Regarding Proposed OPA FIT Program |
Tuesday, April 14, 2009 |
|
Requiring additional security |
Tuesday, April 14, 2009 |
|
Initial Application period - 60 days |
Tuesday, April 14, 2009 |
|
Curtailment of wind |
Tuesday, April 14, 2009 |
|
Long term contracts |
Tuesday, April 14, 2009 |
|
Renewable Energy projects for First Nations |
Tuesday, April 14, 2009 |
|
Solar Pricing for brownfield properties |
Tuesday, April 14, 2009 |
|
9% Degression |
Tuesday, April 14, 2009 |
|
100% ecoEnergy to OPA |
Tuesday, April 14, 2009 |
|
Comments on Legacy Projects |
Monday, April 13, 2009 |
|
Recommendations to Define and Prioritize Legacy Projects - By Western Solargenics |
Monday, April 13, 2009 |
|
Alternative settlement mechanism for embedded projects |
Saturday, April 11, 2009 |
|
Investment Climate for Northern Ontario (Q#10371) |
Saturday, April 11, 2009 |
|
Water Rental Charge |
Saturday, April 11, 2009 |
|
Comment on Legacy Projects - Transmission Connected |
Saturday, April 11, 2009 |
|
Per-developer price degradation for ground-mounted solar (Q&A: 10125) |
Saturday, April 11, 2009 |
|
Provincial Content (Q&A: 10124) |
Saturday, April 11, 2009 |
|
Comment on Legacy (Biogas) Projects |
Friday, April 10, 2009 |
|
OWA Input to Legacy Project Policy |
Friday, April 10, 2009 |
|
Waterpower Concerns |
Friday, April 10, 2009 |
|
APPrO comments on the treatment of legacy projects |
Friday, April 10, 2009 |
|
Legacy Projects and Initialization |
Friday, April 10, 2009 |
|
OPA FIT-CALL FOR COMMENT ON LEGACY PROJECTS |
Friday, April 10, 2009 |
|
Legacy Projects |
Friday, April 10, 2009 |
|
Legacy Project Criteria |
Friday, April 10, 2009 |
|
CanWEA FIT Transition Submission |
Friday, April 10, 2009 |
|
Legacy Projects |
Friday, April 10, 2009 |
|
FIT Legacy Project Priority |
Friday, April 10, 2009 |
|
Legacy Projects comment |
Friday, April 10, 2009 |
|
Legacy Project Definition - FPLE Submission |
Friday, April 10, 2009 |
|
FIT Rules - Comments on Legacy Projects |
Friday, April 10, 2009 |
|
Comment on Biogas Legacy Projects |
Friday, April 10, 2009 |
|
Incentive Payments for Dispatchable Power Systems |
Friday, April 10, 2009 |
|
Legacy Projects and Initialization Period |
Friday, April 10, 2009 |
|
Excessive Burearcracy and Complexity |
Friday, April 10, 2009 |
|
Initialization Period Issues |
Friday, April 10, 2009 |
|
Consideration for Stranded RESOP Projects |
Friday, April 10, 2009 |
|
Defining Legacy Projects |
Thursday, April 09, 2009 |
|
Legacy Project Status |
Thursday, April 09, 2009 |
|
Legacy Projects comment |
Thursday, April 09, 2009 |
|
Re: Call for Comment on Legacy Projects |
Thursday, April 09, 2009 |
|
Initialization and Legacy Process |
Thursday, April 09, 2009 |
|
FIT - treatement and definition of Legacy Projects |
Thursday, April 09, 2009 |
|
Legacy Project Eligability |
Thursday, April 09, 2009 |
|
Legacy Projects |
Thursday, April 09, 2009 |
|
Legacy Projects |
Wednesday, April 08, 2009 |
|
Tech specific consultations (Q#10340) |
Wednesday, April 08, 2009 |
|
Eligibility Requirements for wind (Q&A #10273) |
Wednesday, April 08, 2009 |
|
Notice to Proceed - 2 deadlines (Q&A #10259) |
Wednesday, April 08, 2009 |
|
Areas of Lower Renewable energy uptake (Q&A ID: 10279) |
Wednesday, April 08, 2009 |
|
Northern Hydro Projects |
Wednesday, April 08, 2009 |
|
FIT - Definition and Treatment of Legacy Projects |
Wednesday, April 08, 2009 |
|
Legacy Projects - Clear Initial Intentions of RESOP - |
Tuesday, April 07, 2009 |
|
FIT Legacy Projects Comments |
Monday, April 06, 2009 |
|
Eliminate Distinction between Ground and Roof Mount |
Monday, April 06, 2009 |
|
Fit Procing PV Assumptions |
Monday, April 06, 2009 |
|
An Outlook to 2010 Final Report, June 2007-Ses 4 Proposed Feed-in Prices |
Monday, April 06, 2009 |
|
Settlement for Generation Connected to Host Facilities |
Sunday, April 05, 2009 |
|
Propsed FIT and fair way forward for consideration |
Sunday, April 05, 2009 |
|
Assumptions regarding cost of debt and return on equity |
Saturday, April 04, 2009 |
|
Existing RESOP Contractor Concern |
Saturday, April 04, 2009 |
|
"A Contract is a Contract |
Saturday, April 04, 2009 |
|
Solar - RESOP conversion to FIT (Q#10222) |
Friday, April 03, 2009 |
|
Wind - Evaluating Milestones (E-Mail) |
Friday, April 03, 2009 |
|
Early Movers (Q#10192) |
Friday, April 03, 2009 |
|
PV GROUND MOUNT (Q#10278) |
Friday, April 03, 2009 |
|
Initial Feasibility Assessment |
Friday, April 03, 2009 |
|
Convert existing RESOP to REFIT - the fair choice |
Thursday, April 02, 2009 |
|
SOALR PV & PERMANENT BROWNFIELD SITES (ref#10240) |
Thursday, April 02, 2009 |
|
Small Wind FIT Rate |
Thursday, April 02, 2009 |
|
Small wind turbines need help! |
Thursday, April 02, 2009 |
|
Tracking Ground Mount 40 % |
Wednesday, April 01, 2009 |
|
MOVING FROM RESOP to HOME FIT |
Wednesday, April 01, 2009 |
|
Ground Mount PV |
Wednesday, April 01, 2009 |
|
Notice to Proceed (Q&A 10259) |
Wednesday, April 01, 2009 |
|
Legacy Projects & Other comments |
Wednesday, April 01, 2009 |
|
Solar tariff by size/zoning vice position. |
Wednesday, April 01, 2009 |
|
Legacy Projects; up until and including March 13th, 2009. |
Wednesday, April 01, 2009 |
|
Steamlining for Solar Rooftop Generators |
Tuesday, March 31, 2009 |
|
Comments on the FIT Program and Green Energy Act |
Tuesday, March 31, 2009 |
|
CIA/SIA Costs |
Tuesday, March 31, 2009 |
|
Same premiums for roof and ground mounted solar systems preferred |
Tuesday, March 31, 2009 |
|
10 Day Response Requirements |
Sunday, March 29, 2009 |
|
RESOP NOT OPERATIONAL & GROUND MOUNTED POLES |
Saturday, March 28, 2009 |
|
Solar PV Building Integrated |
Thursday, March 26, 2009 |
|
Small Wind (<10k) |
Wednesday, March 25, 2009 |
|
DRAFT HOME REFIT Rules |
Wednesday, March 25, 2009 |
|
Ground pedestal (post)mounted solar |
Wednesday, March 25, 2009 |
|
Program Training |
Tuesday, March 24, 2009 |
|
Locational Benefits |
Sunday, March 22, 2009 |
|
What is the logic behind Securities? |
Sunday, March 22, 2009 |
|
FEED IN TARIFF FOR WIND |
Friday, March 20, 2009 |
|
Met data requirement |
Friday, March 20, 2009 |
|
Transition from RESOP to Home ReFIT (<10kW) |
Thursday, March 19, 2009 |
|
Manager of Operations |
Thursday, March 19, 2009 |
|
Offer Notice Acceptance Deadline is too Short |
Tuesday, March 17, 2009 |
|
Recaptured Waste Heat should qualify for FIT |
Tuesday, March 17, 2009 |
|
Pole mount issue |
Monday, March 16, 2009 |
|
Is there any detail schedule for southern Ontario's TS capacity expansion? |