| Category: | Solar - Connection |
| Subject: | Queue Exempt and LDC Preferences |
| ID: | 10519 |
| Date: | 8/13/2009 |
| Question: | What would happen to a proponent if we proposed to install solar pv on a commercial rooftop behind the meter and receive a NTP/FIT contract, but in discussions with the LDC, they prefer to have us connect in front of the meter for various technical or operational reasons/constraints? Do we have to re-submit for NTP or FIT contract? |
| Answer: | The OPA would amend the FIT contract to accommodate the required change. |