Q&A Tool

Below is a list of questions that were submitted electronically to the OPA during the development of the FIT Program. You may click on any question to view the question details and answers. 

Please note that these questions and answers were based on the draft FIT Rules. We therefore strongly recommend that you refer to the current FAQs which are based on the final FIT Rules.

Click headings to sort this list.  
ID Category Subject Date Status
10777 Micro-Generator - General Refusal to pay for electricity production 9/23/2009 Answered
10776 Solar - Eligibility Criteria Definition of parking structure 9/18/2009 Answered
10775 General - Consultation Process Project that uses neighbors meter 9/18/2009 Answered
10773 Solar - Contract Pricing Current LDC Rules for Net metered Systems 9/18/2009 Answered
10772 Other 9/15/2009 Answered
10771 Other ldc CHARGES 9/16/2009 Answered
10770 Other Application deadline 9/15/2009 Answered
10768 Wind - General Provencial\Canadian Content 9/15/2009 Answered
10767 Solar - Contract Pricing Parking lot structure PV mounts 9/16/2009 Answered
10766 Wind - General 9/15/2009 Answered
10765 Solar - General Limits on total rooftop solar applications and timelines 9/16/2009 Answered
10764 Other government agencies 9/18/2009 Answered
10763 Other Assignment and Change of Control 9/18/2009 Answered
10761 Solar - General Grants 9/15/2009 Answered
10760 Micro-Generator - General Solar Micro Gen on Seperate Lan (sub #428) 9/16/2009 Answered
10759 Other Transmission Maps (submission 427) 9/15/2009 Answered
10758 Micro-Generator - General Roof Leasing for Solar (submission 426) 9/15/2009 Answered
10757 Solar - Eligibility Criteria CAE Facilities 9/16/2009 Answered
10756 Solar - General Proof of access requirement 9/9/2009 Pending
10753 Solar - General Incremental NTP Security 9/10/2009 Answered
10752 Solar - Eligibility Criteria Solar < 250 kW 9/10/2009 Answered
10751 Solar - Connection Embedded Connection kWh Accounting 9/8/2009 Answered
10750 Solar - General Fit & Microfit 9/16/2009 Answered
10749 Micro-Generator - General Metering and delays 9/16/2009 Answered
10748 Solar - Eligibility Criteria 9/16/2009 Answered
10747 Micro-Generator - General multiple microfit contracts 9/16/2009 Answered
10746 Other Summary of Security Deposit Rules 9/15/2009 Answered
10745 Wind - Contract Pricing Indexed Contract Price 9/2/2009 Pending
10744 Other Transmission Capacity 9/15/2009 Answered
10743 Other Launch Applications - Projects relying on Bruce to Milton 9/15/2009 Answered
10742 Micro-Generator - General Alternate Solar Power Micro Gen Site 9/16/2009 Answered
10741 Micro-Generator - General Submission of Contract 9/8/2009 Answered
10740 Solar - Eligibility Criteria Existing Generator / System Testing and Commissioning 9/2/2009 Answered
10739 Micro-Generator - General Undersized generator 9/4/2009 Answered
10738 Other Personal Net Worth Statements 9/16/2009 Answered
10737 Other Condominium elegibility 9/2/2009 Answered
10736 Solar - General Zoning 9/2/2009 Answered
10735 Solar - Connection Net Meter & microFIT @ the same residence 9/8/2009 Answered
10734 Micro-Generator - General Where is the Application Document (submission #236) 8/28/2009 Answered
10733 Solar - Contract Pricing Capital Cost Allowance & Solar Income taxation (submission #345) 9/9/2009 Answered
10732 Micro-Generator - General Leasing of roofs (submission 384) 8/28/2009 Answered
10731 Solar - Eligibility Criteria Solar PV installations (submission #294) 8/28/2009 Answered
10730 Other Capacity Allocation Exemptions (submission 289) 8/28/2009 Answered
10729 Micro-Generator - General MicroFIT rules regarding municipalities 9/8/2009 Answered
10728 Micro-Generator - General 9/8/2009 Answered
10726 Other Upgrades to distribution system 9/8/2009 Answered
10725 Other Economic connection test 9/15/2009 Answered
10724 Other Economic connection test 9/15/2009 Answered
10723 Other Time Stamp process 9/9/2009 Answered
10722 Wind - Contract Pricing Negative HOEP 8/28/2009 Pending
10721 Wind - Connection Connection Points 8/28/2009 Pending
10720 Solar - Contract Pricing Provincial Content Required for Solar PV panels 9/2/2009 Answered
10719 Micro-Generator - General Microfit ground mount 9/8/2009 Answered
10718 Solar - General Supplier vs. LDC customer 9/8/2009 Answered
10716 Bio-Energy - General Failure of LDC to meet Schedule 8/28/2009 Answered
10715 Solar - Contract Pricing Calculation of Indexed Contract Price 9/4/2009 Answered
10714 Wind - General Rationale behind lower wind price 9/9/2009 Answered
10713 Other Difference between Net Metering and FIT 8/28/2009 Answered
10711 Other Required Zoning 8/28/2009 Answered
10710 Solar - Eligibility Criteria Provincially affiliated bodies 8/26/2009 Answered
10709 Other Proponent residency requirements under FIT 8/28/2009 Answered
10708 Other MicroFIT Contract - CALCULATION OF INDEXED CONTRACT PRICE 9/4/2009 Answered
10707 Micro-Generator - General MicroFit-Transfer of Contract 8/27/2009 Answered
10706 Micro-Generator - General Microfit- Proof of ownership or access 8/27/2009 Answered
10705 Solar - Eligibility Criteria 8/24/2009 Answered
10704 Micro-Generator - General 10kW definition 8/27/2009 Answered
10703 Micro-Generator - General 8/27/2009 Answered
10702 Micro-Generator - General 30 day waiting period - Microfit 8/28/2009 Answered
10701 Micro-Generator - General Questions for microFIT program 8/27/2009 Answered
10700 Micro-Generator - General Rept: Micro-Fit Program Rules 9/4/2009 Answered
10699 Micro-Generator - General Rep: Micro-Fit Program Rules 8/27/2009 Answered
10698 Other Security Reimbursement for EA failure? 9/2/2009 Answered
10697 Micro-Generator - General Inverter 8/27/2009 Answered
10696 Other Transmission Projects 8/28/2009 Answered
10695 Micro-Generator - General Micro Fit draft rules 8/27/2009 Answered
10694 Other Connection Point and connection costs 8/25/2009 Answered
10693 Other Land zoning and taxes (solar) 8/25/2009 Answered
10692 Solar - Eligibility Criteria 8/27/2009 Answered
10691 Bio-Energy - Contract Pricing Type of connection 8/28/2009 Answered
10690 Micro-Generator - General 2 10kw systems, one building, two owners 8/27/2009 Answered
10689 Other Tangible Net Worth from Equity Provider 9/17/2009 Answered
10688 Micro-Generator - General microFIT - Supplier vs. LDC customer 8/24/2009 Answered
10686 Other FIT Launch Period - Similar Experience Criteria 8/17/2009 Answered
10685 Micro-Generator - General Micro Fit Rules and agreement querstions (various) 8/24/2009 Answered
10684 Micro-Generator - General Meter owned by LDC, but applicant to ensure smart meter used? (microFIT contract draft Aug 14th) 9/16/2009 Answered
10683 Solar - Contract Pricing Two 10kW projects on same property 8/27/2009 Answered
10682 Other Application Security requirements for Capacity Allocation Exempt Projects 9/7/2009 Answered
10681 Solar - Eligibility Criteria residential rooftops on out buildings 8/24/2009 Answered
10679 Other Project Financing 8/18/2009 Answered
10678 Wind - Contract Pricing Wind Turbine Questions (Sub #276) 8/13/2009 Answered
10677 Other how is the Aboriginal Price Adder is calculated? (Sub #277) 8/13/2009 Answered
10676 Other Capacity Allocation Exempt Facilities ( C.A.E.F. ) less than or equal to 500 kW on 27.6 kV Feeder 8/27/2009 Answered
10675 Bio-Energy - Contract Pricing Biogas Pricing - Revised Draft 8/13/2009 Answered
10674 Other Capacity Allocation Exempt Facility Definition (Sub # 272) 8/13/2009 Answered
10673 Other 8/26/2009 Answered
10671 Bio-Energy - Contract Pricing Peak Performance Factor 9/2/2009 Answered
10670 Solar - General Solar Thermal 8/24/2009 Answered
10669 Solar - Contract Pricing Preferential pricing for Solar PV installations on Brownfields 8/24/2009 Answered
10668 Solar - Contract Pricing Ground Solar restrictions 8/24/2009 Answered
10667 Other Capacity Allocation Exempt Facility 8/18/2009 Answered
10665 Other Late COD due to the 15 month NTP Response Allowance 8/17/2009 Answered
10664 Solar - Contract Pricing Adjusting the rate to prime interest rate 8/14/2009 Answered
10663 Solar - Eligibility Criteria Rooftop Eligibility - Equestrian Riding Arenas 8/14/2009 Answered
10662 Other Distribution Availability Test (DAT) 8/17/2009 Answered
10661 Other OPA Discretion to Reject 8/19/2009 Answered
10660 Micro-Generator - General microFiT Contract on same property as existing RESOP contract 8/7/2009 Answered
10659 Solar - Eligibility Criteria PV solar arrays 8/7/2009 Answered
10658 Other Settlement for non-IESO Market Participants and Amendments of the DSC 8/24/2009 Answered
10657 Solar - General Progress Reports 8/24/2009 Answered
10656 Solar - General Legality of LDC's Entering into FIT contracts 8/13/2009 Answered
10655 Solar - General System rating and degradation 8/24/2009 Answered
10654 Solar - Eligibility Criteria Draft Contract 2.4.b - Financial Plan 8/24/2009 Answered
10653 Solar - Eligibility Criteria Definition of Rooftop 8/18/2009 Answered
10652 Other Treatment of Capital Grants 8/24/2009 Answered
10651 Solar - General 8/18/2009 Answered
10650 Solar - Connection Connection for Behind the Meter applications 8/28/2009 Answered
10649 Solar - Contract Pricing Pricing for Behind the Meter applications 8/28/2009 Answered
10648 Wind - Contract Pricing Contract Price Escalator 8/18/2009 Answered
10647 Solar - Eligibility Criteria Commercial Operation Date 8/18/2009 Answered
10646 Solar - Eligibility Criteria Completion and Performance Security Fee? 8/27/2009 Answered
10645 Solar - Eligibility Criteria SOLAR PV PROJECTS 8/13/2009 Answered
10644 Wind - Contract Pricing Escalation of Price prior to Contract Execution 8/18/2009 Answered
10643 Micro-Generator - General Connection and Metering For MicroFIT Projects 8/13/2009 Answered
10642 Bio-Energy - Eligibility Criteria Fuel Supply 8/18/2009 Answered
10641 Other late NTP 8/26/2009 Answered
10640 Other Liquidated Damages for Non-launch and Zero Acceleration projects 8/26/2009 Answered
10639 Other FIT Rules - COD Acceleration Days 8/28/2009 Answered
10638 Bio-Energy - Connection CIA 8/13/2009 Answered
10637 Hydroelectric - General re - Re-built generating facilities and FIT rules 7/27/2009 Answered
10636 Solar - Eligibility Criteria Provincial Content 8/7/2009 Answered
10635 Solar - General What is involved in expanding your pv project? 8/4/2009 Answered
10634 Solar - Eligibility Criteria Shovel readiness and equipment availability 8/13/2009 Answered
10633 Other Micro Fit Program 8/4/2009 Answered
10632 Other After The FIT Contract Expires 8/24/2009 Answered
10631 Other Metering Hybrid Generation Site 8/4/2009 Answered
10630 Other Connection details - transmission circuit 8/4/2009 Answered
10629 General - Consultation Process Connection details - breaker requirements 8/4/2009 Answered
10628 Solar - General Does Contract Default Date Shrink with COD Acceleration? 8/4/2009 Answered
10626 Wind - Eligibility Criteria Offshore Wind 8/4/2009 Answered
10625 Solar - Eligibility Criteria 10kW Micro-FIT limit 8/13/2009 Answered
10624 Solar - Eligibility Criteria Rooftop definition 8/13/2009 Answered
10623 Solar - Eligibility Criteria microFIT Program - Section 2.1(a)(iii) 8/4/2009 Answered
10622 Hydroelectric - Eligibility Criteria Access Rights on Prov Crown Land - Waterpower 8/13/2009 Answered
10621 Hydroelectric - General Major Equipment Component - Waterpower 7/31/2009 Answered
10620 Other 7/31/2009 Answered
10619 Other Completion and Performanc Security 8/4/2009 Answered
10618 Bio-Energy - Contract Pricing Fuel supply escalator 7/31/2009 Answered
10617 Other Launch date for TAPS Tool 7/31/2009 Answered
10616 General - Consultation Process Registered Facility 8/7/2009 Answered
10615 Hydroelectric - General New or Incremental Hydroelectric Development 7/31/2009 Answered
10614 Solar - General System "nameplate rating" 8/13/2009 Answered
10613 Other Successful Experience with Similar Facility 7/31/2009 Answered
10612 Solar - Eligibility Criteria Multi-site Solar Power 7/31/2009 Answered
10609 Solar - Connection Distrbution feeder connection 15kv 7/31/2009 Answered
10608 Solar - General PV - Nameplate rating 8/13/2009 Answered
10607 Solar - Eligibility Criteria No Requirement for Proof of Product Before Applying 8/24/2009 Answered
10606 Solar - Eligibility Criteria Launch criteria 7/31/2009 Answered
10605 Solar - Eligibility Criteria Provincial Content size limits 7/31/2009 Answered
10604 Solar - Contract Pricing Why subsidize Solar? 7/31/2009 Answered
10603 Solar - Connection Connection Application 7/31/2009 Answered
10602 General - Consultation Process Historic CIA holding FIT capacity hostage 7/31/2009 Answered
10601 Wind - General Crown Land 7/31/2009 Answered
10600 Micro-Generator - General Toronto Hydro and Micro Fit 7/28/2009 Answered
10599 Micro-Generator - General Solar PV and Provincial Content 7/31/2009 Answered
10598 Solar - Connection Net Metering/FIT Program 8/4/2009 Answered
10597 Solar - General Provision 3.2 in the the new draft rules 7/31/2009 Answered
10596 Other Rural Area Grid Connection 7/31/2009 Answered
10595 Solar - Contract Pricing Escalation Percentage for Solar PV projects 8/4/2009 Answered
10594 Other residential installations 8/4/2009 Answered
10593 Other Behind the grind connection 7/31/2009 Answered
10592 Solar - General Ontario Building Code 2006/FIT for Solar PV rooftop 8/4/2009 Answered
10591 General - Consultation Process FIT Contract Exhibits - Draft June 8, 2009 8/13/2009 Answered
10590 Solar - General Gross Nameplate Definitions 8/13/2009 Answered
10589 Other COD Acceleration Days 8/11/2009 Answered
10588 General - Consultation Process 8/11/2009 Answered
10587 General - Consultation Process Community clarification 7/17/2009 Answered
10586 General - Consultation Process The rated capacity and the amount I will use for my own home 8/11/2009 Answered
10585 General - Consultation Process New FIT Rules- Legacy Projects 8/11/2009 Answered
10584 General - Consultation Process FIT Rules Eligibility Requirements 7/27/2009 Answered
10583 Bio-Energy - General Off-farm AD 7/17/2009 Answered
10582 Bio-Energy - Contract Pricing escalation percentage 9/9/2009 Answered
10581 General - Consultation Process Contract timing summaries 7/17/2009 Answered
10580 Other Magnetic Generator, acceptation and rate 7/17/2009 Answered
10579 Solar - General Provincial Content 7/17/2009 Answered
10578 Micro-Generator - General Home REFIT Program: When we can expect it? 7/17/2009 Answered
10577 Bio-Energy - Eligibility Criteria Treated wood waste 8/12/2009 Answered
10576 Solar - General income tax solar <10kw 7/17/2009 Answered
10575 Solar - General transmission charges 8/13/2009 Answered
10574 Solar - Contract Pricing Clarification of solar array mounting 7/17/2009 Answered
10573 General - Consultation Process Micro FIT 7/17/2009 Answered
10572 Wind - General NTP Response Date 8/13/2009 Answered
10571 Other Eastern Orange Zone 7/31/2009 Answered
10570 Solar - General Proposed Solar PV Feed in Tariff Program: 8/13/2009 Answered
10569 Solar - General PV System power rating 7/17/2009 Answered
10568 Wind - General Letters of Intent 7/31/2009 Answered
10567 General - Consultation Process Request NTP 8/12/2009 Answered
10566 General - Consultation Process What is an Automatic NTP facility? 8/12/2009 Answered
10565 Wind - General NTP - Conditional on Financial Plan? 8/12/2009 Answered
10564 Wind - General Leaving FIT Reserve 7/31/2009 Answered
10563 General - Consultation Process FIT Contract -Draft June 8th, 2009 7/31/2009 Answered
10562 General - Consultation Process PV name plate rating 7/17/2009 Answered
10561 Wind - General Repermitting new turbines 8/12/2009 Answered
10560 Solar - General Single owner eligible for payment from multi-site solar installations 7/8/2009 Answered
10559 Solar - General Solar Array on abutting property 7/8/2009 Answered
10557 Micro-Generator - General 2 properties 7/8/2009 Answered
10556 Solar - Eligibility Criteria Can I go ahead and connect my solar PV panels now? 7/7/2009 Answered
10555 General - Consultation Process Home PV calculation 8/13/2009 Answered
10554 Other Duration of FIT Program 8/13/2009 Answered
10553 Solar - Connection CIA Submission 7/17/2009 Answered
10552 Other Contract Appendices - Form of Lender Consent 8/14/2009 Answered
10551 Other Contract Appendices - Form of Confidentiality Agreement 8/14/2009 Answered
10550 Wind - General Application Security $10,000 for wind? 8/14/2009 Answered
10548 Solar - General GST and PST charges on Solar PV panels and ancillary equipment 7/17/2009 Answered
10547 Other CCRA 8/13/2009 Answered
10545 Solar - Eligibility Criteria 7/17/2009 Answered
10544 Solar - Eligibility Criteria CRD 6/30/2009 Answered
10543 Solar - Connection Connection costs 7/7/2009 Answered
10542 Other Eco Energy 7/17/2009 Answered
10541 Solar - Eligibility Criteria Interpretation of Section G: Proposed Renewable Energy Approval 7/7/2009 Answered
10540 Solar - Connection Behind Meter 7/17/2009 Answered
10539 Solar - Connection Solar PV 7/7/2009 Answered
10538 Wind - General Demonstrated location access requirements 8/24/2009 Answered
10537 Wind - Connection Voltage requirements 8/14/2009 Answered
10536 Wind - General FIT financial backing 7/17/2009 Answered
10535 Wind - Connection Interconnection process 7/17/2009 Answered
10534 Solar - General 7/7/2009 Answered
10533 Solar - Contract Pricing Pricing for Ground PV Installations 7/7/2009 Answered
10531 Solar - Contract Pricing The 50% to be paid to OPA 6/29/2009 Answered
10530 Solar - General Solar Tracking 6/29/2009 Answered
10529 Solar - Connection how do we determine capacity at a given location 6/29/2009 Answered
10528 Micro-Generator - General <10 kW Pricing for Ground Mounted PV 6/29/2009 Answered
10527 Other Gross or Net? 8/13/2009 Answered
10526 Other MicroFit 6/29/2009 Answered
10525 Other Draft Contract of June 08 6/29/2009 Answered
10524 Wind - Eligibility Criteria Smallest Size 6/29/2009 Answered
10523 Micro-Generator - General Where do we fill out the Micro FIT application? 6/29/2009 Answered
10522 Solar - General Connection Resource Database 6/30/2009 Answered
10521 Solar - General The 10kw to 50kw solar system 6/29/2009 Answered
10520 Solar - Connection Mico-Generator Connection costs 6/29/2009 Answered
10519 Solar - Connection Queue Exempt and LDC Preferences 8/13/2009 Answered
10518 Other change of control provisions 8/13/2009 Answered
10517 General - Consultation Process Legacy Projects- Next Steps 6/29/2009 Answered
10516 Solar - Contract Pricing Capacity Overproduction & Improvements 6/18/2009 Answered
10515 Solar - Eligibility Criteria Small Multi-unit Commercial 6/29/2009 Answered
10512 Other Existing Completely Redeveloped generating station 6/9/2009 Answered
10511 Solar - General Settlement 6/9/2009 Answered
10510 Micro-Generator - General Low interest loans 8/13/2009 Answered
10508 Solar - Eligibility Criteria Solar Technology 6/22/2009 Answered
10507 Solar - Eligibility Criteria Leasing roof space 8/13/2009 Answered
10505 General - Consultation Process Beginning of Initialization Period - Queue Positions 6/9/2009 Answered
10502 Hydroelectric - General Redeveloped generating station 5/26/2009 Answered
10501 Solar - Eligibility Criteria Wall Mounted Panels 6/9/2009 Answered
10499 Bio-Energy - Eligibility Criteria Biomass Gasification 8/13/2009 Answered
10498 Micro-Generator - General SES 8: Timeline for approval (#1257) 5/25/2009 Answered
10497 Wind - Contract Pricing 5/25/2009 Answered
10496 Solar - Connection Changes in Distribution System Code 6/3/2009 Answered
10495 General - Consultation Process Future Performance Security 6/29/2009 Answered
10494 Other Curtailment 8/13/2009 Answered
10493 Wind - Eligibility Criteria wind data requirement clarification 8/13/2009 Answered
10492 General - Consultation Process Draft FIT Contract 6/3/2009 Answered
10491 Solar - General Calculation of potential revenue from a solar install 5/29/2009 Answered
10489 Solar - Contract Pricing Nameplate rating or true output 5/29/2009 Answered
10488 Solar - General Solar PV on rooftop on buildings before 2006, different building code 5/29/2009 Answered
10487 General - Consultation Process Draft Contract FIT 6/9/2009 Answered
10486 Solar - General Solar panels mounted on parking lot canopies/definition 5/29/2009 Answered
10485 General - Consultation Process Multiple rooftop PV projects on one rooftop 6/8/2009 Answered
10484 Solar - Eligibility Criteria RESOP to FIT 6/8/2009 Answered
10483 Wind - Contract Pricing Small wind 5/26/2009 Answered
10482 Micro-Generator - General transferring contract 5/25/2009 Answered
10481 General - Consultation Process Green Energy Act 5/25/2009 Answered
10480 Micro-Generator - General Cost for Residential homes to enter the FIT program 5/25/2009 Answered
10478 Wind - Eligibility Criteria Group I Project 8/13/2009 Answered
10477 Hydroelectric - Contract Pricing revised draft pricing options 5/25/2009 Answered
10474 Wind - Contract Pricing Capacity Factor Wind 5/25/2009 Answered
10473 General - Consultation Process Community Group DEFINITION 5/25/2009 Answered
10472 Wind - Contract Pricing Northern Ontario costs for wind projects 5/25/2009 Answered
10471 Wind - Connection TAT Availability 5/25/2009 Answered
10469 Solar - Contract Pricing SES 8: Solar pricing (1247) 5/25/2009 Answered
10468 Micro-Generator - General combined technologies re: Question ID 10444 6/22/2009 Answered
10467 Solar - Eligibility Criteria Roof Photovoltaics 5/25/2009 Answered
10466 Solar - General Definition of Rooftop / Pricing clarity 5/25/2009 Answered
10465 Solar - Eligibility Criteria Multiple Rooftop Installations 7/8/2009 Answered
10463 Solar - Connection Queue Exempt Facilities 6/18/2009 Answered
10462 Other Performance Bond Risk (Sub #186) 8/24/2009 Answered
10461 Solar - General Home REFIT Program 5/25/2009 Answered
10460 Solar - General RESOP & FIT together 5/5/2009 Answered
10459 General - Consultation Process Metis Definition 7/7/2009 Answered
10457 Solar - General Timeline of FIT program 5/5/2009 Answered
10456 Solar - Contract Pricing Pricing Schedule 5/5/2009 Answered
10455 Solar - General Roof top photovoltaics 5/5/2009 Answered
10453 Other Application Security 8/24/2009 Answered
10452 General - Consultation Process First Nations Projects 6/18/2009 Answered
10451 General - Consultation Process Residential solar array expansion 5/5/2009 Answered
10449 Solar - General Calculation of Residential Generation Facility 5/5/2009 Answered
10448 Micro-Generator - General 5/5/2009 Answered
10447 Other Community Project - condominium? (Sub #158) 4/25/2009 Answered
10446 Other Foreign Ownership & Financing 4/25/2009 Answered
10445 Other legal regulations for holding the interest 4/25/2009 Answered
10444 Micro-Generator - General combined technologies 5/5/2009 Answered
10441 Wind - Eligibility Criteria Legacy Transmission Project Evalution criteria 5/26/2009 Answered
10440 Solar - Eligibility Criteria Eligibility of Provincially Owned Corporations 5/5/2009 Answered
10439 Solar - Contract Pricing Further Details re: Navigant Assumption 5/5/2009 Answered
10438 Other Section 4.3(c) (Sub. #160) 4/21/2009 Answered
10437 Other CIA (Sub. #161) 4/21/2009 Answered
10436 Solar - Contract Pricing Non PV solar projects... stirling dishes... FIT pricing ? 5/5/2009 Answered
10435 Other SES 6: 80% transformer limit (#1075) 5/4/2009 Answered
10434 Other SES 6: RESOP & reserved transmission (#1073) 4/25/2009 Answered
10433 Other SES 6: Slide 7 (#1076) 4/25/2009 Answered
10432 Other SES 6: Projects below red line (#1072) 4/25/2009 Answered
10430 Wind - Connection Northern Ontario and Prosperity 4/25/2009 Answered
10429 Other Northern Ontario Heritage Fund/pricing 4/25/2009 Answered
10428 Solar - Contract Pricing Tariff prices for many systems of less than 10 kW 4/25/2009 Answered
10425 Other Dispatchable Power 4/25/2009 Answered
10424 Solar - Contract Pricing 'take or pay' clause 4/20/2009 Answered
10423 Wind - Connection Interconnection Costs 4/25/2009 Answered
10421 Wind - Contract Pricing Pricing Escalation for Wind 4/20/2009 Answered
10420 Solar - Eligibility Criteria Technology other that Solar PV 4/20/2009 Answered
10419 Hydroelectric - Eligibility Criteria Marine Current Technology 4/21/2009 Answered
10418 Micro-Generator - General Application Process - Less than 10kW 4/21/2009 Answered
10417 Other Southwest Region 4/21/2009 Answered
10416 Wind - Connection MET Tower 4/21/2009 Answered
10415 Other Initialization period 4/25/2009 Answered
10414 Solar - Contract Pricing Solar PV - Project Sizing Definition 4/25/2009 Answered
10412 Solar - Eligibility Criteria Quebec Power supplied to Ontario residents- are they eligible 4/21/2009 Answered
10411 Wind - General MET Tower 4/21/2009 Answered
10410 Other Information in Connection Resource Database 4/25/2009 Answered
10409 Other Requirements for Wind and Water Applications 4/21/2009 Answered
10408 Solar - General security deposits 4/20/2009 Answered
10407 General - Consultation Process OPA administrative process 4/20/2009 Answered
10406 Other Energy from Waste 4/21/2009 Answered
10405 Wind - Eligibility Criteria SES 2: MNR and Applicant of Record 4/14/2009 Answered
10404 Other Initial Fit Application Activity 4/14/2009 Answered
10403 Other Legacy Projects - Definition 4/14/2009 Answered
10402 Solar - Eligibility Criteria Options and Offer to Purchase agreement expiration dates. 4/25/2009 Answered
10401 Other SES 5: Slide 28 Definition of Related Products 5/5/2009 Answered
10399 Bio-Energy - General SES 5: Related products 5/25/2009 Answered
10398 Other SES 5: HOEP 4/21/2009 Answered
10397 Other SES 5: Security interest 6/18/2009 Answered
10396 Other SES 5: HOEP greater than FIT 4/21/2009 Answered
10395 Other SES 5: Slide 19 Interest 4/25/2009 Answered
10394 Other SES 5: Slide 19 - HOEP 4/25/2009 Answered
10393 Other Definition of Access 4/25/2009 Answered
10392 Other SES 5: NTP Security 4/25/2009 Answered
10391 Other SES 5: Force Majeure due to federal approval 4/21/2009 Answered
10390 Other Application process (Submission #100) 4/21/2009 Answered
10389 Other 4/25/2009 Answered
10388 Other Queue Exempt Facility - phase projects 4/25/2009 Answered
10387 Other SES 5: Map of grid access points 4/20/2009 Answered
10386 Other SES 5: Secured lender 4/25/2009 Answered
10385 Solar - Contract Pricing SES 5: Grouping projects 4/15/2009 Answered
10383 Hydroelectric - Contract Pricing SES 4: Cost of rental charges 5/5/2009 Answered
10382 Other Financial commitment documentation for Notice-To-Proceed application 4/25/2009 Answered
10381 Solar - Contract Pricing Using Generated Electricty On Site & FIT (Submission 102) 4/15/2009 Answered
10378 Solar - General Financial feasibility of rooftop PV systems 4/15/2009 Answered
10377 General - Consultation Process 4/21/2009 Answered
10376 Solar - Contract Pricing Contract Pricing - Change in PV technology 4/21/2009 Answered
10375 General - Consultation Process Multiple projects 4/21/2009 Answered
10374 Wind - Eligibility Criteria Use of remote sensing equipment 4/21/2009 Answered
10373 General - Consultation Process Difference between Online Q&A and Submission 4/14/2009 Answered
10370 Solar - Eligibility Criteria Made in Canada 4/21/2009 Answered
10369 Solar - General After 20 years 4/13/2009 Answered
10366 Other yellow/orange zone 4/21/2009 Answered
10365 Wind - Contract Pricing 10 mgw wind 4/13/2009 Answered
10364 Solar - General General/Historical Rates (SUB#62) 4/8/2009 Answered
10361 Wind - Eligibility Criteria Trained Meteorologist 4/14/2009 Answered
10359 Solar - Contract Pricing location vs. size of installation 4/14/2009 Answered
10358 Other SES 4: Global Adjustment 4/11/2009 Answered
10357 Other SES 4: 20 year contract 4/8/2009 Answered
10356 Solar - Eligibility Criteria Metering & Settlement 6/3/2009 Answered
10355 Hydroelectric - Contract Pricing Community/Aboriginal Pricing 4/8/2009 Answered
10354 Solar - Contract Pricing SES 4: Which model number 4/8/2009 Answered
10353 Solar - Contract Pricing SES 4: Canadian sources 4/8/2009 Answered
10351 Other SES 4: Exchange rate 6/9/2009 Answered
10350 Bio-Energy - General SES 4: CHP 4/14/2009 Answered
10349 Other SES 4: CapEx assumptions 5/29/2009 Answered
10348 Other SES 4: Summary package 4/11/2009 Answered
10347 Bio-Energy - Contract Pricing SES 4: Full price 4/8/2009 Answered
10346 General - Consultation Process Application review and exceptance 4/20/2009 Answered
10345 Other SES 4: Global Adjustment 4/14/2009 Answered
10344 Wind - Contract Pricing SES 4: Wind - peaking price 4/8/2009 Answered
10343 Other FIT Pricing 4/13/2009 Answered
10342 Micro-Generator - General SES 4: Definition of rooftop 4/8/2009 Answered
10341 Solar - Contract Pricing SES 4: Degression 4/8/2009 Answered
10339 Other SES 4: Aboriginal Projects 4/11/2009 Answered
10338 Other SES 4: Standard connection cost assumption 4/11/2009 Answered
10337 Bio-Energy - Contract Pricing SES 4: OPG and biomass initiative 4/14/2009 Answered
10336 Solar - Contract Pricing SES 4: OEB's microscale embedded generation 4/11/2009 Answered
10335 Other SES 4: Review for unusual increases 4/7/2009 Answered
10334 Hydroelectric - Contract Pricing Session 4 Aboriginal Pricing 4/8/2009 Answered
10333 Other SES 4: Connection costs 4/15/2009 Answered
10332 Bio-Energy - Contract Pricing SES 4: Heat & Power approach 4/11/2009 Answered
10331 Wind - Contract Pricing SES 4: Capacity factor for wind 4/7/2009 Answered
10330 Other SES 4: Community Based Technologies 4/11/2009 Answered
10329 Solar - Contract Pricing SES 4: RESOP contract holder 4/11/2009 Answered
10328 Other SES 4: Assumptions with debt 4/15/2009 Answered
10327 Other SES 4: Concentrated Solar 4/11/2009 Answered
10326 Other SES 4: Pricing and economic factors 4/13/2009 Answered
10325 Solar - Contract Pricing SES 4: 2 year review period 4/8/2009 Answered
10324 Solar - Contract Pricing SES 4: Decrease in technology costs 4/8/2009 Answered
10323 Solar - Contract Pricing SES 4: 9% degression 4/8/2009 Answered
10322 Wind - Eligibility Criteria Legacy Project Eligibility 4/21/2009 Answered
10321 General - Consultation Process NTD 4/11/2009 Answered
10320 General - Consultation Process Waterpower - requirement for 10 years correlated data 6/8/2009 Answered
10319 General - Consultation Process FIT for solar PV installations 4/11/2009 Answered
10318 Solar - General Micro Fit - Sale of Home & Contract 5/29/2009 Answered
10317 Other Fees (SUB#60) 4/6/2009 Answered
10316 Hydroelectric - Contract Pricing Provisions for renewable energy former non-utility Generators ? 4/22/2009 Answered
10315 General - Consultation Process Renewable Energy Project Permitting 4/11/2009 Answered
10314 General - Consultation Process Project Site to Grid Connection Costs 4/7/2009 Answered
10313 General - Consultation Process Transmission Capacity 4/11/2009 Answered
10312 General - Consultation Process FIT Rates 4/7/2009 Answered
10311 Micro-Generator - General Project Cost and Return on Investment 4/13/2009 Answered
10310 Micro-Generator - General Small Business 1-10kv and 10-50kv Renewable Projects 4/7/2009 Answered
10308 Solar - Contract Pricing Micro-solar 4/8/2009 Answered
10307 Solar - Contract Pricing 4/13/2009 Answered
10306 General - Consultation Process Ses 4 Proposed Feed-in Prices 6/9/2009 Answered
10305 General - Consultation Process Solar, wind and batteries 5/26/2009 Answered
10304 Solar - Contract Pricing SES 2: Price Degression 4/3/2009 Answered
10303 Other Early Movers (SUB#30) 4/3/2009 Answered
10302 Other Micro CHP (SUB#26) 4/3/2009 Answered
10301 Solar - General Solar Building Integrated (SUB#20) 4/3/2009 Answered
10300 General - Consultation Process Application Ready? (SUB#38) 4/3/2009 Answered
10299 General - Consultation Process Connection Alteration Proposal (SUB#46) 4/3/2009 Answered
10298 Bio-Energy - Contract Pricing Incremental Project - Existing Facility Capacity 4/8/2009 Answered
10297 Other RESOP Applications (SUB #21) 4/11/2009 Answered
10296 Other SES 2: Economic Connection Test & future developments 4/2/2009 Answered
10295 Solar - Contract Pricing Tranche Sizes 4/21/2009 Answered
10294 Other Behind the Meter Settlement 4/15/2009 Answered
10293 Solar - General Do queue exempt facilities have to provide a performance and completion security? 4/11/2009 Answered
10292 Other Legacy Projects 4/7/2009 Answered
10291 Other Completion Security (SUB#50) 4/2/2009 Answered
10290 Other Geothermal (SUB#44) 4/2/2009 Answered
10289 Other COMMISSIONING & ELIGIBILITY (SUB#40) 4/2/2009 Answered
10288 Solar - General Solar Questions (SUB#10) 4/2/2009 Answered
10287 Bio-Energy - General Geothermal Energy (SUB#12) 4/2/2009 Answered
10286 Other Legacy Project 4/7/2009 Answered
10285 Other New application (SUB#8) 8/13/2009 Answered
10284 Solar - Contract Pricing Groundmount Pricing - 10-100kW and 100-500kW 4/8/2009 Answered
10282 General - Consultation Process Small wind turbines inside cities 4/3/2009 Answered
10281 General - Consultation Process certification of small wind turbines and inverters 4/8/2009 Answered
10280 General - Consultation Process Small wind turbines in cities 4/3/2009 Answered
10279 General - Consultation Process zoning for small wind turbines <3 Kw 4/8/2009 Answered
10275 Solar - Eligibility Criteria Solar Rooftops < 500Kw Exempt from Security Fee? 4/2/2009 Answered
10274 Solar - Contract Pricing Justification for buying electricity at 80.2 cents 4/15/2009 Answered
10273 Wind - General Resource Assessment Planning 4/8/2009 Answered
10272 General - Consultation Process RESOP price differentials 4/3/2009 Answered
10270 General - Consultation Process Legacy Projects 4/3/2009 Answered
10268 General - Consultation Process Application Submittal (legacy projects) 4/7/2009 Answered
10267 Solar - General PV - low cost financing 4/1/2009 Answered
10266 Other SES 3: Host under contract with Retailer 4/2/2009 Answered
10265 General - Consultation Process Consultation with LDCs 4/2/2009 Answered
10264 Other SES 3: HOEP amount 4/2/2009 Answered
10263 General - Consultation Process SES 3: Interconnection Process 4/14/2009 Answered
10262 Other SES 3: Contract for differences 4/2/2009 Answered
10261 Other 4/2/2009 Answered
10260 Solar - Connection SES 3: Separate meter requirement 4/2/2009 Answered
10259 Other SES 3: Splitting NTP into separate deadlines 4/8/2009 Answered
10258 General - Consultation Process FIT Contract - Funding / CIA / CCE 4/3/2009 Answered
10257 Solar - Contract Pricing Wall mounted panels 3/31/2009 Answered
10256 Other SES 3: project timeline variability 4/15/2009 Answered
10255 Other SES 3: Notice to Proceed and time lines 4/2/2009 Answered
10254 Other SES 3: Draft application 4/2/2009 Answered
10253 Other SES 3: Bruce to Milton Upgrade 4/11/2009 Answered
10252 General - Consultation Process taxes 4/3/2009 Answered
10251 Other SES 3: Cluster of 6 projects 4/11/2009 Answered
10250 Other SES 3: 4% project cost 4/2/2009 Answered
10249 Other SES 3: Areas of planned development 4/2/2009 Answered
10248 Other SES 3: Category 1 becomes Category 2 4/11/2009 Answered
10247 Other SES 3: Category 1 4/2/2009 Answered
10246 Other SES 3: Updates on transmission for pre-NTP 4/2/2009 Answered
10245 Hydroelectric - Connection Zoning 4/2/2009 Answered
10244 General - Consultation Process Land, Leasing, Options 4/3/2009 Answered
10243 General - Consultation Process Time Differentiated Pricing 4/2/2009 Answered
10242 General - Consultation Process Audio File for Consultation Sessions 4/2/2009 Answered
10241 Other SES 2: Legacy projects and queue position 3/30/2009 Answered
10240 Solar - General Permanent Brownfield Applications 9/15/2009 Answered
10239 Other SES 2: School boards and community based projects 3/31/2009 Answered
10238 Solar - Contract Pricing SES 2: Rationale for price degression 3/30/2009 Answered
10237 Solar - Contract Pricing SES 2: Price degresssion 3/30/2009 Answered
10236 Solar - General SES 2: Residential ground mounted panels 3/30/2009 Answered
10235 Other SES 2: Pricing Worksheets 3/30/2009 Answered
10234 Other SES 2: Limit on application 3/30/2009 Answered
10233 Other Connection Point alternatives 4/15/2009 Answered
10232 Wind - General Transformer Stations identification 4/21/2009 Answered
10231 Wind - Eligibility Criteria Met Tower location 5 km 4/2/2009 Answered
10230 Micro-Generator - General Home refit program 4/1/2009 Answered
10229 Wind - Eligibility Criteria Subsidies 4/2/2009 Answered
10228 Wind - Connection Northern Ontario 4/2/2009 Answered
10226 Other Land lease/ownership requirement 4/15/2009 Answered
10224 Hydroelectric - General Northern Hydroelectric Initiative 5/5/2009 Answered
10223 General - Consultation Process Execution of 4/8/2009 Answered
10221 Solar - Contract Pricing CPI for solar 4/2/2009 Answered
10220 Wind - Eligibility Criteria Legacy status - CIA submitted but not completed 4/1/2009 Answered
10219 Hydroelectric - Eligibility Criteria No existing contract 4/2/2009 Answered
10218 Hydroelectric - Connection FIT - Northern Hydro Initiative 4/21/2009 Answered
10217 General - Consultation Process Wall BIPV Solar Energy Systems 4/2/2009 Answered
10216 Hydroelectric - General Northern Hydro Initiative 4/21/2009 Answered
10215 General - Consultation Process Access to archived FIT stakeholder meeting audio files 4/2/2009 Answered
10214 Hydroelectric - General Northern Hydro Initiative 4/21/2009 Answered
10213 General - Consultation Process Pricing - escalation 4/2/2009 Answered
10212 General - Consultation Process Section 7.2(e) - economic test 4/1/2009 Answered
10211 General - Consultation Process 10-day response time 4/2/2009 Answered
10210 General - Consultation Process Interest on security 4/1/2009 Answered
10209 General - Consultation Process Parental guarantee as security 4/2/2009 Answered
10208 Hydroelectric - General Hydro over 50 MW 4/2/2009 Answered
10207 General - Consultation Process Section 7.2.(e) - Tx cost allocation 6/3/2009 Answered
10206 General - Consultation Process FIT Reserve & Contract offer 4/1/2009 Answered
10205 Wind - Connection Economic Test & Tx development 4/15/2009 Answered
10204 Hydroelectric - Eligibility Criteria Representative stream flow data 4/3/2009 Answered
10203 Hydroelectric - Eligibility Criteria Section 2.1 (a) (iv). 4/11/2009 Answered
10202 Micro-Generator - General Connecting Prior to FIT Launch 4/1/2009 Answered
10201 Solar - General Building permits from City/Municipality for commercial or home rooftops Solar Systems 4/2/2009 Answered
10200 General - Consultation Process SES 2: Production Line Information 4/2/2009 Answered
10199 General - Consultation Process SES 2: MOE and MNR coordination 4/2/2009 Answered
10198 Wind - Eligibility Criteria CIA applications - below the red line 4/2/2009 Answered
10197 Wind - Connection Connection Capacity 4/8/2009 Answered
10196 Other Consumer Protection...Bankable Technologies and Installation Processes 4/1/2009 Answered
10194 General - Consultation Process Unexecuted RESOP Contracts 4/1/2009 Answered
10193 Solar - Eligibility Criteria Ground Mount Solar and Proximity to Load 4/2/2009 Answered
10191 General - Consultation Process SES 2: Socialized Costs 4/2/2009 Answered
10190 General - Consultation Process SES 2: Parameters of Economic Threshold 4/2/2009 Answered
10189 Other SES 2: Point of Connection 4/2/2009 Answered
10188 Other SES 2: Production Line 4/2/2009 Answered
10187 Other SES 2: Process Timelines 4/2/2009 Answered
10186 Other SES 2: Multiple CIAs 4/2/2009 Answered
10185 Other SES 2: Renewable Energy Approval 4/2/2009 Answered
10184 General - Consultation Process SES 2: Early Adopters of rooftop solar 4/2/2009 Answered
10183 Other SES 2: CIA/SIA 4/2/2009 Answered
10182 General - Consultation Process SES 2: Energy from Waste 4/2/2009 Answered
10181 General - Consultation Process SES 2: Former RES Projects 4/2/2009 Answered
10180 General - Consultation Process application fees fore 250 kW & 500 kW projects 4/2/2009 Answered
10179 Other SES 2: Expected date of launch 3/24/2009 Answered
10177 General - Consultation Process SES 1: Targets 4/8/2009 Answered
10176 Other SES 1: Queue Exempt Facility 4/2/2009 Answered
10175 Other 4/2/2009 Answered
10174 Other SES 1: Program Initialization 4/1/2009 Answered
10173 General - Consultation Process SES 1: Renewable Energy Approval Process 4/1/2009 Answered
10172 Bio-Energy - Eligibility Criteria SES 1: Clean Energy Opportunities 4/1/2009 Answered
10171 Bio-Energy - Eligibility Criteria SES 1: Biomass/biogas cogeneration 4/1/2009 Answered
10170 Other SES 1: Environmental Attributes 4/1/2009 Answered
10169 Solar - Eligibility Criteria SES 1: Concentrated Solar Power 4/1/2009 Answered
10168 Other SES 1: Waste Energy Recovery 4/1/2009 Answered
10167 Other SES 1: When is price applied 4/1/2009 Answered
10166 Other SES 1: Clean Energy and First Nations 4/2/2009 Answered
10165 Other SES 1: Old Orange Zones 4/2/2009 Answered
10164 Solar - Contract Pricing SES 1: OPA assumptions for Pricing 4/2/2009 Answered
10162 Micro-Generator - General SES 1: GST/PST refunds 4/1/2009 Answered
10161 Other SES 1: Timelines 4/1/2009 Answered
10160 Other SES 1: Cogeneration 4/2/2009 Answered
10159 Other SES 1: Purpose of Application Security Fee? 4/2/2009 Answered
10158 Solar - Contract Pricing SES 1: Price reduction 4/2/2009 Answered
10156 Other SES 1: Shovel ready projects 4/11/2009 Answered
10155 General - Consultation Process Connection outside FIT 4/15/2009 Answered
10154 General - Consultation Process How to appeal not offering FIT pricing to existing Standard Offer Contract Holders? 4/2/2009 Answered
10153 General - Consultation Process 4/2/2009 Answered
10152 Solar - Contract Pricing Small Scale Solar Ground Mount 4/1/2009 Answered
10150 Solar - Eligibility Criteria SES 1: Security 4/2/2009 Answered
10149 Solar - Contract Pricing SES 1: Degression 4/2/2009 Answered
10148 Other Application Fee 3/24/2009 Answered
10147 General - Consultation Process SES 1: Program Initialization Period 4/2/2009 Answered
10146 Micro-Generator - General SES 1: Technological Innovation 4/11/2009 Answered
10145 General - Consultation Process SES 1: Legacy projects 4/2/2009 Answered
10144 Other SES 1: Hybrid 4/11/2009 Answered
10143 Wind - Eligibility Criteria SES 1: Met tower and data collection 4/2/2009 Answered
10142 General - Consultation Process SES 1: Incremental 3/27/2009 Answered
10141 Other SES 1: Geothermal 3/27/2009 Answered
10140 Other SES 1: Rates 4/1/2009 Answered
10139 Bio-Energy - Eligibility Criteria SES 1: Wood from construction 3/27/2009 Answered
10138 Other SES 1: Projects off grid - conservation 4/11/2009 Answered
10137 Solar - Contract Pricing SES 1: Degression 3/27/2009 Answered
10136 Other SES 1: Hybrid Systems 3/27/2009 Answered
10135 Other SES 1: Municipal ownership 3/27/2009 Answered
10134 Other SES 1: Distribution Companies 3/27/2009 Answered
10133 Micro-Generator - General SES 1: Selling house with solar panels 3/27/2009 Answered
10132 Other SES 1: Attributes including ecoEnergy 3/27/2009 Answered
10131 General - Consultation Process What is the logic behind securities? 4/11/2009 Answered
10130 Other Eligibility of Geothermal for Electricity Production 4/2/2009 Answered
10129 Solar - General The application process for REFIT - For homeowners 3/27/2009 Answered
10128 General - Consultation Process Application submission time 4/2/2009 Answered
10127 Solar - General Net Metering Connection 3/31/2009 Answered
10126 Solar - General Gross Nameplate Capacity 4/2/2009 Answered
10125 Solar - Contract Pricing Price degression for ground mounted systems 4/1/2009 Answered
10124 Solar - General Provincial Content 4/2/2009 Answered
10123 General - Consultation Process Solar -- rooftop mount 3/27/2009 Answered
10121 Solar - General For Legacy projects, $15,000 vaporized? 4/2/2009 Answered
10120 General - Consultation Process SES 1: European FIT 3/30/2009 Answered
10119 Micro-Generator - General SES 1: Home REFIT Rules 3/23/2009 Answered
10118 General - Consultation Process SES 1: Legacy Projects and CIA 3/23/2009 Answered
10117 General - Consultation Process SES 1: Renewable Energy Facilitator 3/23/2009 Answered
10116 General - Consultation Process SES 1: Funding of upgrades? 3/23/2009 Answered
10115 General - Consultation Process SES 1: Kyoto guidelines 3/30/2009 Answered
10114 General - Consultation Process Ses 1: Legacy project cutoff 3/23/2009 Answered
10113 General - Consultation Process SES 1: Expansions and upgrades 3/23/2009 Answered
10112 General - Consultation Process SES 1: Cost sharing 3/23/2009 Answered
10111 General - Consultation Process SES 1: Connection costs 3/23/2009 Answered
10110 General - Consultation Process SES 1: Provincial Content 4/1/2009 Answered
10108 Solar - General Change in time frame for Solar Farm installation from 3 to 2 years. 4/1/2009 Answered
10107 Micro-Generator - General SES 1: Micro-wind allowed 3/30/2009 Answered
10105 General - Consultation Process CIA's honoured 3/23/2009 Answered
10104 Solar - General CIA, CCA, CCRA 3/24/2009 Answered
10103 Solar - Contract Pricing 10kW micros 4/2/2009 Answered
10102 General - Consultation Process How do we get "Recaptured Energy" qualified for FIT? 3/24/2009 Answered
10101 General - Consultation Process Legacy Projects, Queue and Initilization Period 4/1/2009 Answered
10100 Wind - Connection CCRA Timeline for Legacy Projects 4/15/2009 Answered
10099 Solar - General 3/23/2009 Answered
10098 Solar - General Ground Mount Solar Systems 3/20/2009 Answered
10097 Solar - General What Are House REFIT Rule? 3/23/2009 Answered
10096 Solar - General Standard Offer Program 3/20/2009 Answered
10094 Bio-Energy - Connection Interconnection - Shallow vs Deep Cost Allocation 3/20/2009 Answered
10093 General - Consultation Process Completion and Performance Security 3/23/2009 Answered
10092 Wind - Eligibility Criteria Aggregation of CIA 3/20/2009 Answered
10091 General - Consultation Process Clarification of Section 11.2(c) 4/2/2009 Answered
10090 General - Consultation Process RESOP vs FIT for rooftop solar 3/20/2009 Answered
10089 General - Consultation Process Economic Connection Test 3/27/2009 Answered
10088 General - Consultation Process Starting date of 20-year agreement 3/20/2009 Answered
10087 Other Municipal Taxes 3/23/2009 Answered
10086 Other Evaluation of Property Value 3/20/2009 Answered
10084 General - Consultation Process Northwestern orange zone 3/20/2009 Answered
10083 General - Consultation Process Solar Farm installation deadline from 3 to 2 years! 3/27/2009 Answered
10082 General - Consultation Process Renewable Energy Approval requirements 3/20/2009 Answered
10081 Solar - Eligibility Criteria Residential REFIT Rules 3/23/2009 Answered
10080 Solar - Eligibility Criteria Net Metering 3/24/2009 Answered
10079 General - Consultation Process Hydro One Applications List 4/11/2009 Answered
10078 General - Consultation Process CONNECTION RESOURCE DATABASE 3/20/2009 Answered
10077 Solar - General Duration of Solar Contract 3/20/2009 Answered
10076 Wind - Eligibility Criteria Legacy Projects 3/20/2009 Answered
10075 Solar - Contract Pricing Rate Reduction Beyond 100 MW 3/20/2009 Answered
10074 Solar - Contract Pricing APPLICATION SECURITY vs. COMPLETION SECURITY 3/20/2009 Answered
10073 Other Manufacturing Incentives 3/23/2009 Answered
10072 General - Consultation Process SES 1: RESOP Pricing 3/20/2009 Answered
10071 General - Consultation Process SES 1: Completion and Performance Security 3/23/2009 Answered
10070 Other SES 1: CHP III 3/20/2009 Answered
10069 Other SES 1: Provincial Content 3/23/2009 Answered
10068 Micro-Generator - General SES 1: Apply now 3/24/2009 Answered
10067 General - Consultation Process SES 1: Targets 3/20/2009 Answered
10066 General - Consultation Process SES 1: Proposed FIT Pricing 3/20/2009 Answered
10065 Other SES 1: RESOP contracts 3/20/2009 Answered
10064 Other SES 1: Legacy projects 3/20/2009 Answered
10063 Wind - Contract Pricing SES 1: Pricing for micro-wind 3/20/2009 Answered
10062 Micro-Generator - General SES 1: Micro-scale ground-mounted PV 3/20/2009 Answered
10061 Solar - Contract Pricing SES 1: Price for 10kW size 3/20/2009 Answered
10060 Other SES 1: Interconnection costs 3/20/2009 Answered
10059 Other SES 1: Zoning in Oak Ridge Moraine & Green Belt 3/20/2009 Answered
10058 General - Consultation Process Qualifying Recaptured Energy 3/20/2009 Answered
10057 General - Consultation Process Price Schedule 3/23/2009 Answered
10056 General - Consultation Process Attending Tuesday Consultations 3/20/2009 Answered
10055 Wind - Eligibility Criteria Impact of MNR delay in securing Applicant of Record 3/23/2009 Answered
10054 Bio-Energy - Connection Connection Cost Allocation 3/20/2009 Answered
10053 General - Consultation Process Qualifying Recaptured Energy 3/20/2009 Answered
10052 Wind - General local content 3/20/2009 Answered
10051 Solar - Contract Pricing BIPV under 10 kW 4/2/2009 Answered
10050 General - Consultation Process Wind Assessment 3/20/2009 Answered
10049 Other Audit 3/20/2009 Answered
10048 General - Consultation Process Eligible Aboriginal Projects 4/2/2009 Answered
10046 Solar - Contract Pricing 3/20/2009 Answered
10045 Wind - Eligibility Criteria Provisions for local content 3/20/2009 Answered
10044 General - Consultation Process Environmental commissioner 3/19/2009 Answered
10042 Micro-Generator - General Existing RESOP not transferred to FIT 3/20/2009 Answered
10041 Wind - Contract Pricing follow up onshore v. offshore wind 3/20/2009 Answered
10040 General - Consultation Process Micro-Wind 3/20/2009 Answered
10039 Solar - General Ground Mount Pricing 3/23/2009 Answered
10038 Micro-Generator - General Draft Program Rules - Multiple Energy Sources 3/25/2009 Answered
10035 Solar - Eligibility Criteria Pending solar projects 3/20/2009 Answered
10034 Solar - Eligibility Criteria Solar < 10 kW 3/20/2009 Answered
10033 General - Consultation Process RESOP vs FIT 3/20/2009 Answered
10032 General - Consultation Process Northern Region constraints? 3/20/2009 Answered
10031 Solar - Connection metering 3/20/2009 Answered
10030 Solar - Contract Pricing FiT Consistancy for small Community Based Solar Systems 3/20/2009 Answered
10029 Solar - General leasing someone's rooftop for putting a Solar project 3/20/2009 Answered
10028 Solar - Contract Pricing 100 kW FIT 4/2/2009 Answered
10027 General - Consultation Process Key Contacts at OPA 3/20/2009 Answered
10026 Solar - Contract Pricing 9% Degression of Solar PV - Clarification 3/20/2009 Answered
10025 Wind - Contract Pricing Big difference between Solar vs. Wind FIT prices 3/20/2009 Answered
10024 Solar - Eligibility Criteria Parking lot structure PV mounts 3/20/2009 Answered
10023 General - Consultation Process FIT for Clean Energy Projects 3/16/2009 Answered
10022 Bio-Energy - Connection Hydro One CCRA Qualification under FIT 3/20/2009 Answered
10021 General - Consultation Process Contract Requirements 3/20/2009 Answered
10020 General - Consultation Process Current RESOP Contracts 3/19/2009 Answered
10019 General - Consultation Process POWER HOST 3/16/2009 Answered
10018 General - Consultation Process carbon credits 3/19/2009 Answered
10017 General - Consultation Process Ground mounted Solar PV & Water Power 3/16/2009 Answered
10016 Other Status of current RESOP Applicants 4/2/2009 Answered
10015 Wind - Contract Pricing Onshore v offshore wind 3/16/2009 Answered
10014 General - Consultation Process Exclusion of Energy modes 4/2/2009 Answered
10013 General - Consultation Process Publication of background information 3/20/2009 Answered
10012 General - Consultation Process Ground mounted PV 3/20/2009 Answered
10011 General - Consultation Process Existing Projects Eligible for New FIT rates 3/20/2009 Answered
10010 Bio-Energy - Contract Pricing Inflation adjustment 4/2/2009 Answered
10009 Solar - Contract Pricing FIT pricing for current RESOPs 3/16/2009 Answered
10008 Solar - Contract Pricing Application of new FIT rates to existing RESOP SOCs 4/2/2009 Answered
10007 General - Consultation Process CIA Queue positon 3/16/2009 Answered