FIT Price Schedule

 

 

Feed-in-Tariff Program

Prices for Renewable Energy Projects in the FIT Programs

Base Date:  September 30, 2009

Renewable Fuel

Size tranches

Contract Price ¢/kWh

Escalation Percentage5

Biomass1,2      
  ≤ 10 MW 13.8 20
  > 10 MW 13.0 20
Biogas1,2      
On-Farm ≤ 100 kW 19.5 20
On-Farm > 100 kW ≤ 250 kW 18.5 20
Biogas ≤ 500 kW

16.0

20

Biogas >500 kW ≤ 10 MW 14.7 20
Biogas > 10 MW 10.4 20
Waterpower1,2,3      
  ≤ 10 MW 13.1 20
  > 10 MW ≤ 50 MW 12.2 20
Landfill gas1,2      
  ≤ 10MW 11.1 20
  > 10 MW 10.3 20
Solar PV      
Rooftop ≤ 250 kW 71.3 0
Rooftop > 250 ≤ 500 kW 63.5 0
Rooftop > 500 kW 53.9 0
Ground Mounted2, 4 ≤ 10 MW 44.3 0
Wind2      
Onshore Any size 13.5 20

 

 

1. Peak performance factor applies.

2. Aboriginal price adder and community price adder eligible as outlined in
the table provided in the price adder section of this website.

3. In the case of an incremental waterpower project, the incremental project
together with the existing generating facility to which it is incremental cannot
exceed 50 MW.

4. In the case of an incremental solar project, the incremental project
together with the existing generating facility to which it is incremental cannot
exceed 10 MW. 

5. Percentage escalated will be applied to eligible renewable fuels as calculated in Exhibit B of the FIT contract.