Capacity allocation exempt projects are generally small projects connected to the distribution system. The Distribution System Code defines these projects as:
-
projects with no more than 250 kilowatts of rated generating capacity where the facility is connected to a less than 15 kV line
-
projects of 500 kW or less of rated generating capacity where the facility is connected to a 15 kV or greater line.
Click on the link for more details about the FIT Rules relating to capacity allocation exempt projects.